§ 3142. General Requirements.  


Latest version.
  • (a) Conveyances covered by ASME A18.1-2003, section 1.1, Scope, and Article 42 of Title 8 shall comply with ASME A18.1-2003, Safety Standard for Platform Lifts and Stairway Chairlifts, which is hereby incorporated by reference, and the following:
    (1) Group II, sections 3094.2(r) and 3094.5.
    (2) Power doors shall comply with ANSI/BHMA A156.19-1997, American National Standard for Power Assist and Low Energy Power Operated Doors, which is hereby incorporated by reference.
    (b) Acceptance inspections and tests shall comply with ASME A18.1-2003, section 10.4, that are applicable to the type of elevator installed or altered.
    (c) Periodic inspections shall comply with ASME A18.1-2003, section 10, applicable for the type of elevators involved.
    (d) Periodic tests shall comply with section 3141.6(c), (e), and (f) and ASME A18.1-2003, section 10.3.
    (e) Periodic tests shall be witnessed by a Certified Competent Conveyance Inspector (CCCI) or a Division CCCI. Periodic tests witnessed by a CCCI shall be reported to the Division by the CCCI on a form provided by the Division, or equivalent, within 21 days of the test. The information required to be reported shall include:
    (1) The name of the CCCI witnessing the test;
    (2) Type of test performed;
    (3) Name of the CQCC and CCCM who performed the test;
    (4) The date of the test; and
    (5) Results of the test.
HISTORY
1. New article 42 (sections 3142-3142.2) and section filed 4-1-2008; operative 5-1-2008 (Register 2008, No. 14).

Note

Note: Authority cited: Sections 142.3 and 7323, Labor Code. Reference: Sections 142.3 and 7323, Labor Code.