California Code of Regulations (Last Updated: August 6, 2014) |
Title 8. Industrial Relations |
Division 1. Department of Industrial Relations |
Chapter 4. Division of Industrial Safety |
Subchapter 6. Elevator Safety Orders |
Group IV. Conveyance Installations for Which the Installation Contract Was Signed on or After May 1, 2008 |
Article 41. Conveyances Covered by Asme A17.1-2004 |
§ 3141.3. Static Controls.
Latest version.
- (a) The installation of static controls shall comply with the requirements of ASME A17.1-2004 applicable to the conveyance involved.(b) The Certified Qualified Conveyance Company (CQCC) installing static controls shall provide the Division with verification that the control complies with the requirements of ASME A17.1-2004. This information shall be in the form of:(1) Electrical schematic diagrams or block diagrams of the control and safety circuits; and(2) A written check-off procedure and demonstration of safety and speed control circuits at the time of the initial inspection.(c) The results of the Electromagnetic Interference (EMI) testing required by ASME A17.1-2004 shall be submitted to the Division for review. The test shall include any wireless communication system used.HISTORY1. New section filed 4-1-2008; operative 5-1-2008 (Register 2008, No. 14).
Note
Note: Authority cited: Sections 142.3 and 7323, Labor Code. Reference: Sections 142.3 and 7323, Labor Code.