§ 1749.1. Submittal of Performance Criteria and Concept Drawings for Design-Build Projects.
Latest version.
- (a) Performance criteria or performance criteria and concept drawings shall be submitted to the BSCC for review and approval before the county issues a request for proposals for the services of a design-build entity.(b) Construction documents shall be submitted to the BSCC and the State Fire Marshal for review and approval.(c) The BSCC will review the construction documents as soon as practicable, but no later than thirty (30) calendar days for Phase I and Phase II projects and no later than forty-five (45) calendar days for Adult Local Criminal Justice Facility projects. In the event of any major deficiencies, the BSCC will notify the county in writing. Deficiencies may be identified as either failures to comply with minimum jail standards or as design features that may pose serious safety, security, operational, or management problems if left uncorrected, even where minimum jail standards are not violated.(d) Pursuant to California Government Code Sections 15820.906, 15820.916, and 15820.925, to enhance safety and security, the BSCC may require changes in construction materials if the materials proposed with the construction documents are not essential or customary, as used statewide for same security level facilities.(e) Deficiencies in compliance with the operational and physical plant requirements in the Minimum Standards for Local Detention Facilities in Title, 15, CCR, Division 1, Chapter 1, Subchapter 4 and Title 24, CCR, Part 1, Section 13-102 and Part 2, Section 1231 and construction materials shall be corrected prior to completion of construction.(f) The Board will have final approval of all projects, and Board approval or disapproval of any project is not subject to the appeal process as described in Article 5.(g) No state moneys shall be encumbered in contracts let by a participating county until performance criteria or performance criteria and concept drawings have been approved by the BSCC pursuant to subsection (a) and a design-build contract has been awarded.HISTORY1. New section filed 11-22-2010 as an emergency; operative 11-22-2010 (Register 2010, No. 48). Pursuant to Penal Code section 5058.3, a Certificate of Compliance must be transmitted to OAL by 5-2-2011 or emergency language will be repealed by operation of law on the following day.2. Certificate of Compliance as to 11-22-2010 order transmitted to OAL 4-14-2011 and filed 5-26-2011 (Register 2011, No. 21).3. Amendment of section heading, section and Note filed 1-9-2014 as an emergency; operative 1-9-2014 (Register 2014, No. 2). A Certificate of Compliance must be transmitted to OAL by 7-8-2014 or emergency language will be repealed by operation of law on the following day.
Note
Note: Authority cited: Sections 15820.906, 15820.916 and 15820.925, Government Code; and Section 6030, Penal Code. Reference: Sections 15820.901, 15820.906, 15820.911, 15820.916, 15820.92 and 15820.925, Government Code; and Section 6029, Penal Code.